For our Web- and Excel-based Business Tools site, see:
AnalysisPlace.com






 
 
  Windows 7 Business Value Analysis

Below is a summary of the results of four scenarios from the HCR Windows 7 ROI tool.  These results can be duplicated using the free basic edition of the tool and can be used to view more extensive details of the costs, benefits, enabling features, and research supporting the findings.
Characteristics of the 4 Scenarios 0.575203789 0.575203789 0.9
Scenario Characteristics (key cost/benefit drivers) Cost Conscious Modernization Focused Balanced Progressive
Organization objective Minimize investment Invest into improving PC manageability & user productivity Typical organization characteristics Maintain technology leadership
Current IT Maturity  Basic (1) Basic (1) Standardized (2) Rationalized+ (3) 
Infrastructure Upgrades No Yes Minor Minor
Current Windows OS Version  XP XP XP / Vista Mix Vista
Primary User Types  Task Worker Mix Mix Info Worker
Feature Usage/Adoption  Basic feature use High Moderate High  (incl. adv features)
Labor Costs  Moderate Average Average High
Hardware Age  Older Older Newer Mostly New
Application Age  Older Older Mix Modern
Software Licensing  No SA No SA SA (incl. MDOP) SA (incl. MDOP)
Image/App/Device Testing Thoroughness  Light testing Moderate Moderate Thorough
Upgrade Method  Manual Automated Semi-auto'd Automated
Upgrade Strategy  Follow Refresh Big Bang/ Forklift Compressed Refresh In-Place Upgrades
Summary - 3 Year Total 0 0 0
The table and graph summarize the costs and benefits of the 4 scenarios and calculates ROI, NPV, IRR, and payback period.  The results shown are average per PC over 3 years.
Cost Conscious  Modernize Balanced  Progressive 
ROI - Total 155% 123% 210% 452%
ROI - Direct Only 29% -2% 24% 41%
Costs  $                         331  $                      1,021  $                         613  $                         399
Benefits - Total  $                         843  $                      2,276  $                      1,899  $                      2,205
Benefits - Direct Only  $                         426  $                         996  $                         759  $                         564
Net Benefits - Total  $                         512  $                      1,255  $                      1,286  $                      1,806
Net Benefits - Direct Only  $                           95  $                          (24)  $                         146  $                         165
 Windows 7 Business Value Summary
Benefit Summary
Below are the benefits enabled by the initiative (per PC per year).  More detailed calculations can be found on the green benefit worksheets in the tool.
Cost Conscious  Modernize Balanced  Progressive 
 IT Labor and Services Benefits   $                           90  $                         222  $                         162  $                         126
 Infrastructure & 3rd-Party Software Cost Avoidance   $                           10  $                           40  $                           36  $                           35
 Other Non-Labor Direct Cost Savings   $                           42  $                           70  $                           55  $                           28
 User PC Management Labor   $                           80  $                         231  $                         206  $                         253
 Other Productivity Benefits   $                           59  $                         196  $                         174  $                         294
Total - Annual  $                         281  $                         759  $                         633  $                         735
Total - 3 Year  $                         843  $                      2,276  $                      1,899  $                      2,205
 Window 7 Benefit Summary
Benefit Details (Annualized)
Cost Conscious  Modernize Balanced  Progressive 
IT Labor and Services Benefits
PC Engineering Services  $                           19  $                           53  $                           39  $                           31
Application Management  $                           14  $                           40  $                           30  $                           23
Security  $                             6  $                           16  $                           11  $                             7
Service Desk (Helpdesk)  $                           12  $                           26  $                           18  $                           13
Deskside (On-Site) Support  $                           31  $                           69  $                           48  $                           33
Administration & Other  $                             -  $                             -  $                             -  $                             -
Client Application Development  $                             7  $                           19  $                           16  $                           19
Total  $                           90  $                         222  $                         162  $                         126
Infrastructure & 3rd-Party Software Cost Avoidance
Security SW/Infrastructure Cost Avoidance  $                             2  $                           15  $                           13  $                           12
PC Management SW/Infrastructure Cost Avoidance  $                             3  $                           14  $                           13  $                           12
Deployment SW/Infrastructure Cost Avoidance  $                             2  $                             5  $                             5  $                             4
Productivity SW/Infrastructure Cost Avoidance  $                             2  $                             6  $                             5  $                             6
Total  $                           10  $                           40  $                           36  $                           35
Other Non-Labor Direct Cost Savings
Reduce Power/Electricity Usage Costs  $                             8  $                           14  $                           12  $                             6
Reduce/Avoid Travel & Commuting Expenses  $                             5  $                           11  $                             9  $                             5
Other Direct Benefits  $                             2  $                             5  $                             5  $                             5
Reduce Future Windows 8 Upgrade Costs  $                           27  $                           41  $                           29  $                           11
Total  $                           42  $                           70  $                           55  $                           28
User PC Management Labor
Support & Self-Help  $                           31  $                           82  $                           74  $                           88
Downtime, Recovery and Rework  $                           13  $                           30  $                           27  $                           33
Security & Privacy  $                           16  $                           65  $                           54  $                           50
Performance  $                           19  $                           54  $                           51  $                           82
Total  $                           80  $                         231  $                         206  $                         253
Other Productivity Benefits
Mobility & Remote Connectivity  $                           13  $                           48  $                           42  $                           53
Navigate and Organize  $                           17  $                           55  $                           51  $                         124
Communication & Collaboration  $                             2  $                             7  $                             6  $                             8
Search, Access, & Analysis  $                           26  $                           81  $                           69  $                           93
Other  $                             2  $                             6  $                             5  $                           16
Total  $                           59  $                         196  $                         174  $                         294
Benefits By Product
Win 7  $                         281  $                         703  $                         583  $                         661
MDOP  $                             -  $                           56  $                           50  $                           74
Total  $                         281  $                         759  $                         633  $                         735
Cost (Investment) Summary
Below are the initial design/development/deployment and added annual on-going costs required to fully deploy, adopt and support the initiative.  Additional details can be found below and on the "Cost" worksheets in the tool.
Cost Conscious  Modernize Balanced  Progressive 
Windows 7
 Design, Engineering, & Mgmt   $                           21  $                           55  $                           43  $                           20
 Hardware / Infrastructure Costs   $                             4  $                         275  $                           11  $                             8
 Windows 7 License Costs   $                             -  $                         153  $                         153  $                         153
 Compat Testing & Remediation   $                         200  $                         171  $                         128  $                           43
 End-User Labor Costs   $                           45  $                         197  $                         131  $                           43
 IT Training & Help Desk Costs   $                           20  $                           31  $                           22  $                           13
 Installation/Deployment Labor   $                             -  $                           12  $                           11  $                             7
 Risk   $                           40  $                           64  $                           53  $                           43
Total  $                         331  $                         959  $                         553  $                         329
 Windows 7 Cost (Investment) Summary
MDOP
 Hardware   $                             -  $                             9  $                             9  $                           11
 Software   $                             -  $                           30  $                           30  $                           30
 IT Labor   $                             -  $                           21  $                           20  $                           27
 User Labor   $                             -  $                             1  $                             1  $                             2
Total  $                             -  $                           62  $                           60  $                           70
Total Costs  $                         331  $                      1,021  $                         613  $                         399
Windows 7 Cost Metrics
Cost Conscious  Modernize Balanced  Progressive 
Upgrade Strategy
Upgrade with hardware refresh (HW would be replaced regardless of Win 7) - includes accelerated refreshes 100% 0% 25% 33%
Hardware replaced (due to Win 7) - would not have been replaced otherwise 0% 25% 0% 0%
In-Place upgrade on existing PC 0% 75% 75% 67%
In-Place upgrade on existing PC - Upgrade RAM/HDD 0% 0% 0% 0%
Total 100% 100% 100% 100%
Design, Engineering, & Mgmt
Labor (Person-weeks) 37 89 70 29
Hardware/Infrastructure Costs
% of PCs fully capable of running Windows 7 (at project start) 52% 75% 76% 100%
% of PCs requiring hardware upgrades (e.g. RAM) due to Windows 7 0% 0% 0% 0%
% of PCs requiring new hardware due to Windows 7 (outside of normal hardware refresh cycle) 0% 25% 0% 0%
Windows 7 License Costs
% of PCs requiring license cost (or new EA) and is not considered a "sunk" cost 0% 0% 0% 0%
% of PCs requiring Software Assurance cost and is not considered a "sunk" cost 0% 0% 0% 0%
Compat Testing & Remediation
# of device models / app versions 731 731 731 731
% undergoing significant testing effort (as opposed no testing or reliance on ACT/certification) 20% 50% 49% 60%
Average testing time (hours each) 5 7 6 5
Fail rate (requiring simple fix): patch, shim, repackage, re-script, driver, retire 22% 22% 17% 8%
Fail rate (requiring significant cost/effort to remediate): re-code, virtualize, upgrade, replace 15% 15% 11% 2%
Average total remediation cost per failed device/app instance  $                           61  $                           53  $                           54  $                           88
Average total remediation cost per failed device model / app version  $                      9,131  $                      7,818  $                      8,017  $                     13,131
Total testing/remediation cost per PC  $                         200  $                         171  $                         128  $                           43
End-User Labor Costs
Average lost productivity due to the upgrade (hrs per user) 0.2 1.7 1.1 0.1
Average training time (hrs per user) 1.3 3.7 2.5 0.7
IT Training & Help Desk Costs
Average training time (hrs per PC-related IT staff) 18.4 27.2 23.7 16.0
Average # of additional helpdesk calls per user due to the upgrade 0.3 0.3 0.2 0.0
Installation/Deployment
Installation Method
Zero Touch Installation (100% remote, except troubleshooting) 0% 53% 52% 67%
Lite Touch Installation 40% 48% 48% 33%
Manual (e.g. OS/apps from OEM media, use Easy Transfer wizard) 60% 0% 0% 0%
Total 100% 100% 100% 100%
Installation Effort/Cost
Refreshes - Prior to Windows 7 (minutes / PC) 95 46 39 26
Refreshes - Windows 7 (minutes / PC) 83 35 30 21
In-Place Installs 83 18 17 9
Cost per PC Upgraded In-Place, if using in-house labor  $                             -  $                           16  $                           15  $                           10
Cost per PC Upgraded In-Place, if outsourced  $                             -  $                             -  $                             -  $                             -
IO Best Practice Adoption
The chart below provides a summary of the extent to which the  organization is expected to adopt additional best practices.  This assessment is based on Microsoft's Core Infrastructure Optimization Maturity Model.
Cost Conscious  Modernize Balanced  Progressive 
Summary
As-Is 5% 5% 26% 57%
To-Be 7% 12% 30% 59%
 IO Best Practice Adoption
As-Is
Identity & Access Management 3% 3% 20% 52%
Desktop, Devices and Svr Mgmt 2% 2% 18% 50%
Desktop Management 3% 3% 20% 53%
Server Management 3% 3% 17% 46%
Mobile Device Management 0% 0% 20% 60%
Virtualization 4% 4% 16% 41%
Security & Networking 7% 7% 31% 63%
Data Protection and Recovery 4% 4% 24% 57%
Security Process & Governance 10% 10% 34% 61%
Total 5% 5% 26% 57%
To-Be
Identity & Access Management 5% 10% 26% 55%
Desktop, Devices and Svr Mgmt 3% 13% 27% 57%
Desktop Management 7% 32% 44% 66%
Server Management 3% 3% 17% 46%
Mobile Device Management 0% 0% 20% 60%
Virtualization 4% 16% 26% 55%
Security & Networking 10% 19% 40% 66%
Data Protection and Recovery 4% 4% 24% 57%
Security Process & Governance 11% 13% 36% 61%
Total 7% 12% 30% 59%
KPI (Key Performance Indicator) Percentiles
The table below provides a summary of the non-financial KPIs.  The percentiles shown are how the organization compares to others in the industry.  0% represents worst performance in the industry (laggard); 50% is average performance; 100% is best in the industry (world class performance).  The "Improvement" indicates how much the organization is expected to improve KPI performance due to the solutions.  Additional details can be found in the "KPIs" worksheet in the tool.
Cost Conscious  Modernize Balanced  Progressive 
As-Is 12.3% 12.3% 27.6% 53.4%
Improvement 7.8% 20.0% 14.3% 6.6%
IT Labor Spending/TCO ($/pc)
The table/chart below summarize the IT labor TCO (total cost of ownership) and TCO savings of the the 4 scenarios.
Cost Conscious  Modernize Balanced  Progressive 
Summary (Core/Operations Only)
As-Is  $                      1,119  $                      1,178  $                         945  $                         807
To-Be  $                      1,036  $                         975  $                         798  $                         700
Savings  $                           83  $                         204  $                         147  $                         107
 
IT Labor Spending/TCO ($/pc)
Current IT Labor TCO
PC Engineering Services  $                         242  $                         254  $                         208  $                         187
Application Management  $                         215  $                         226  $                         183  $                         156
Security  $                         117  $                         123  $                         100  $                           90
Service Desk (Helpdesk)  $                         224  $                         236  $                         188  $                         158
Deskside (On-Site) Support  $                         322  $                         339  $                         266  $                         216
Core TCO  $                      1,119  $                      1,178  $                         945  $                         807
Administration & Other  $                         193  $                         203  $                         198  $                         231
Client Application Development  $                         502  $                         528  $                         486  $                         520
Total  $                      1,814  $                      1,909  $                      1,629  $                      1,559
IT Labor TCO Savings
PC Engineering Services 8% 21% 19% 17%
Application Management 7% 18% 16% 15%
Security 5% 13% 11% 8%
Service Desk (Helpdesk) 6% 11% 10% 8%
Deskside (On-Site) Support 10% 20% 18% 15%
Administration & Other 0% 0% 0% 0%
Client Application Development 1% 4% 3% 4%
Total 5% 12% 10% 8%
Top 10 Features 0 0 0 0
Below are the top features that enable the benefits.  The tool includes a much more extensive assessment of the features, including calculations of the value of the top 100 features.
Cost Conscious  Modernize Balanced  Progressive 
1 Performance imprvmts App-V App-V Performance imprvmts
2 App Compatibility imprvmts Performance imprvmts Performance imprvmts Improved battery life
3 Improved battery life Improved battery life Improved battery life IE 8 (Slices, Acclrtrs., Auto Recovery)
4 Problem Steps Recorder IE 8 (Slices, Acclrtrs., Auto Recovery) IE 8 (Slices, Acclrtrs., Auto Recovery) App-V
5 Built-In Diagnostics User Account Control App Compatibility imprvmts MED-V
6 IE 8 (Slices, Acclrtrs., Auto Recovery) IE7+ Security AppLocker Libraries
7 User Account Control IE 7+ (Tabs, Favortites Ctr) Direct Access Windows Explorer imprvmts
8 Reliability Imprvmts/Troubleshooting Search Problem Steps Recorder Direct Access
9 IE7+ Security App Compatibility imprvmts MED-V Windows Touch
10 IE 7+ (Tabs, Favortites Ctr) AppLocker IE7+ Security ReadyBoost imprvmts